 TITAN II CONSTRUCTION PHOTOS  | 
| 
 
 TITAN II MISSILE SITES 
 
 
 THIS SITE NEARING COMPLETION NEAR DAVIS-MONTHAN AFB NOTE: CABLEWAYS HAVE YET TO BE INSTALLED 
 390TH STRATEGIC MISSILE SQUADRON DAVIS-MONTHAN AFB    
 BEGINNING EXCAVATION 
 
 STARTING EXCAVATION OF SILO 
 
 OVERALL COMPLEX VIEW NOTICE ONLY CONTROL CENTER AND SILO 
 
 PREPARING TO POUR CONCRETE 
 
 MID CONSTRUCTION 
 SETTING FRAME WORK FOR SILO 
 
 BLAST LOCK UNDER CONSTRUCTION 
 
 CONTROL CENTER WITH BLAST LOCK NOTE: LEVEL 3 FLOOR BEING PLACED 
 
 OVERALL COMPLEX VIEW WITH COMPLETED BLAST LOCK NOTE: CABLEWAYS YET TO BE CONSTRUCTED 
 FINAL CONSTRUCTION 
 LONG AND SHORT CABLEWAYS YET TO BE CONSTRUCTED 
 
 SILO CLOSURE DOOR BEING READIED FOR PLACEMENT 
 
 BACKFILLING COMPLETED FUEL AND OXIDIZER HARD STANDS NEAR COMPLETE 
 INTERIOR CONSTRUCTION PHOTOS 390TH STRATEGIC MISSILE WING DAVIS-MONTHAN AFB 
 CONTROL CENTER LEVEL TWO 
 
 LOOKING DOWN ON LAUNCH DUCT DEFLECTOR 
 
 
 
  | 
| 